Sun-microsystems SERVER 1290 Uživatelský manuál Strana 30

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 76
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 29
18 Netra 1290 Server Installation Guide May 2006
Caution – The shipping cradle must be attached when the server is lifted. Failure to
do so will result in major damage to the server.
2. Insert the forks of the lifting device fully through the shipping cradle opening
(
FIGURE 1-10).
FIGURE 1-10 Inserting the Lifting Device Into the Shipping Cradle
3. Lift the server off the wooden shipping pallet and remove the pallet.
4. Extend the outer rails from the cabinet and latch them in the extended position.
5. Lift the server until it is level with the outer rails on the cabinet.
6. Carefully move the lifting device forward until the rails on the server are fully
engaged with the outer rails on the cabinet
(FIGURE 1-11).
The latches on each side must click out, locking the rails.
FRONT
Zobrazit stránku 29
1 2 ... 25 26 27 28 29 30 31 32 33 34 35 ... 75 76

Komentáře k této Příručce

Žádné komentáře